Uncategorized

Studio Progress……..

Stoves
Ken is making great progress on my dye kitchen/studio.
Cabinets are attached and the stove tops/hoods are in as well.  Originally we were going to go with a stainless steel back splash, but I was worried that the heat could be a fire hazard, so we went with subway tiles instead.  You would be amazed at what steam from dye pots can do (just ask me how I know), so I think the tiles were a better choice.

I had Ken put black grout in the white tiles…..better to hide all the dye spatter that would end up staining a lighter colored grout.

The men who will be installing a monitor heater this week will also attach the gas piping to the stoves and then we can put the cabinet doors back on. :-)  So each week gets me a little closer to moving everything out of my kitchen…yay!!

Barn before
Just to give you an idea as to how much work Ken has done, this is a picture of the same space after he pulled down the gross wallboard that was in the barn.  At this point he had re-wired the entire space, added new insulation and had painted the right side of the barn.

Mr. Woolen Rabbit is one awesome guy to have around!!

17 thoughts on “Studio Progress……..

  1. Hi Kim! I was in North Conway yesterday for a super-quick day trip and really wished I could have swung by to say ‘hi’ but it was not to be. You’re new studio looks awesome!!
    I’m loving knitting with my new Pandora, and the Grace you dyed up for me is beyond perfection!! thank you!

    Like

  2. Oh, Kim! How exciting to see it all coming together! You’re right – Mr Woolen Rabbit is a treasure.

    Like

  3. Kudos to Mr. Woolen Rabbit! Fantastic progress! You must be SO ready to move in and get the pots simmering. 🙂

    Like

Leave a Reply to Blogless sharon Cancel reply

Your email address will not be published. Required fields are marked *